How do we find the combined output of two machines working side by side?
Always add rates.
If one machine takes 3 hrs for a job, and the other takes 6 hrs, we can't add or subtract times. We have to change those to rates, (1 job)/(3 hr) and (1 job)/(6hr), and add those.